This listing is closed

Weld Cell Comprising of Assets Listed Below

$25,000.00 USD start

4 Jeanes Street, Beverley SA 5009, Australia
Bidding is closed for this item.

Lot Information

Lot Description

  • Robot , Kuka Model No. KR 180-2 2000, Year of Manufacture: 2009
  • Drawn Arc Stud Weld Controller, Emhart Technologies Model No. DCE 1800/5 2000.00.99.0400x, Year of Manufacture: 2009
  • Drawn Arc Stud Gun, Model No. LM 310/k 00.03, Year of Manufacture: 2009
  • Drawn Arc Stud Gun, Model No. LM 310/k 47.03, Year of Manufacture: 2009
  • 2x Stud Feeder, Model No. ETF 50D, Year of Manufacture: 2009
  • Auto Glue, Graco Model No. 231115, Year of Manufacture: 1996
  • Auto Glue, SCA Model No. 0642 1003, Year of Manufacture: 2010
  • Linear Track/Rotator/Jig Carriage, Custom built, Year of Manufacture: 2009
  • Projection Welder, Obara Model No. RT452H-405-U, Year of Manufacture: 1995
  • Weld Timer, Nadex Model No. PH2-9033, Year of Manufacture: 1999
  • From working Environment


[97120+11]

Bid History

This Lot currently has no bids.

Auction Description

Automotive Parts Manufacturer Major Onsite Clearance - Part 1 - Presses, Feeder/Uncoilers and Weld Cells

Under instructions from Precision Components Australia Pty Ltd

Auction Closes: Friday, 21st September 2018 at 2:00 PM

Inspection: Tueday 18th September 2018 from 2pm to 4pm or By Appointment

Location: 4 Jeanes Street, Beverley SA 5009

Contact: Andrew Monks on 0414 340 399 andrewm@evansclarke.com.au

Please Note the Following Auction Specific Terms - By registering for this auction you acknowledge these, and all other terms of sale as specified. 

Collection: By Appointment as arranged with Evans Clarke National post closure of auction - Collections to be finalised by Dec 20th 2018.

Payment: All assets must be paid for in full prior to any work commencing onsite.

Asset Removal: It is the purchasers responsibility to remove all purchased lots from site. This includes all asset preparation for transport.

Tradespeople and Contractors: All (e.g. electricians, plumbers, riggers, equipment operators) must produce relevant licences and/or white card prior to the commencement of any work on site.

Tooling, Plant & Equipment: Any equipment used onsite in the removal of purchased items must be tested & tagged, and/or compliant with OHW&S legislation and requirements,

Onsite Work: All work carried out onsite must be compliant with all OHW&S legislation, appropriate PPE must be utilised as required or specified.

Site Access: All site attendees must comply with directions given by the Vendor or Auction Staff

Environmental Compliance: All removal, disassembly of assets and work conducted onsite must be compliant with the Environmental Protection Act 1993

 

Important Information

Item Code
Views This item has been viewed 410 times.